Network Rail stated: “Sink holes were spotted on the bridge, meaning that ballast, the stones that the track sits on, was falling through the gap, making the track unstable. We’ve since carried out a thorough inspection of the bridge and are working to safely plug the gaps so that trains can safely run again.”











.jpeg?trim=60,0,60,0&auto=webp&quality=75&width=1200)
